Tendering Results

Since 1.12.2006 the German transmission system operators procure the minute reserve via a shared IT-platform. Since 1.12.2007 this platform has also been used to tender in primary and secondary control power.

Detailed information as well as tendering results you can be found on the following website:

 www.regelleistung.net

The Amprion tendering results for primary and secondary control power of up to 30.11.2007:

PRIMARY CONTROL POWER

Tendering Results Primary Control Power

SECONDARY CONTROL POWER

Tendering Results Secondary Control Power

The Amprion tendering results for minute reserve up to 30.11.2006:

MINUTE RESERVE

2006

2005

2004

2003

2002

2001

Tendering results minute reserve before 01.08.2001

01.2006 - 12.2006

01.2005 - 12.2005

01.2004 - 12.2004

01.2003 - 12.2003

01.2002 - 12.2002

08.2001 - 12.2001

Tendering results minute reserve before 01.08.2001

On the basis of all bids submitted for the respective period, Amprion has awarded the contracts for the supply of minute reserve after having examined the bids from economic and technical perspectives.

The power prices relate to the specified tendering procedure. In case of positive minute reserve Amprion refunds the energy price for the delivered energy to the bidder whereas in case of negative minute reserve the bidder has to pay Amprion the energy price for the obtained energy.

tendering procedure minute reserve MW   demand satisfied   average power price €/kW   bottom energy price €Ct/kWh   maximum energy price €Ct/kWh
                   
01.02.2001 - 30.04.2001 780   yes   11,73   2,50   15,35
01.02.2001 - 30.04.2001 -620   yes   2,26   0,00   2,00
01.05.2001 - 30.06.2001 780   yes   6,25   7,00   10,00
01.05.2001 - 30.06.2001 -620   yes   2,54   0,00   1,00
01.07.2001 - 31.07.2001 780   yes   3,24   7,00   12,00