Tendering Results
Since 1.12.2006 the German transmission system operators procure the minute reserve via a shared IT-platform. Since 1.12.2007 this platform has also been used to tender in primary and secondary control power.
Detailed information as well as tendering results you can be found on the following website:
The Amprion tendering results for primary and secondary control power of up to 30.11.2007:
PRIMARY CONTROL POWER
Tendering Results Primary Control Power
SECONDARY CONTROL POWER
Tendering Results Secondary Control Power
The Amprion tendering results for minute reserve up to 30.11.2006:
MINUTE RESERVE
01.2006 - 12.2006
01.2005 - 12.2005
01.2004 - 12.2004
01.2003 - 12.2003
01.2002 - 12.2002
08.2001 - 12.2001
Tendering results minute reserve before 01.08.2001
On the basis of all bids submitted for the respective period, Amprion has awarded the contracts for the supply of minute reserve after having examined the bids from economic and technical perspectives.
The power prices relate to the specified tendering procedure. In case of positive minute reserve Amprion refunds the energy price for the delivered energy to the bidder whereas in case of negative minute reserve the bidder has to pay Amprion the energy price for the obtained energy.
tendering procedure | minute reserve MW | demand satisfied | average power price €/kW | bottom energy price €Ct/kWh | maximum energy price €Ct/kWh | ||||
---|---|---|---|---|---|---|---|---|---|
01.02.2001 - 30.04.2001 | 780 | yes | 11,73 | 2,50 | 15,35 | ||||
01.02.2001 - 30.04.2001 | -620 | yes | 2,26 | 0,00 | 2,00 | ||||
01.05.2001 - 30.06.2001 | 780 | yes | 6,25 | 7,00 | 10,00 | ||||
01.05.2001 - 30.06.2001 | -620 | yes | 2,54 | 0,00 | 1,00 | ||||
01.07.2001 - 31.07.2001 | 780 | yes | 3,24 | 7,00 | 12,00 | ||||
01.07.2001 - 31.07.2001 | -620 | yes | 1,23 | 0,00 | 0,60 |