Grid feed-in
The network feed-in is the total amount of all inputs of interconnectors, power stations, distribution networks and large consumer networks into the transmission network.
These values are published in tables, as a diagram and with the additional possibility to be downloaded as a file. For all 96 15 min values of the day before these values will be published as mean value in MW. The values will be determined by Amprion to the best of one's ability and without any guarantee. There are no rights to claim the values if it is for technical reasons impossible to calculate or publish them.
With this step the transmission system operators enable the market participants to have a public access to network characteristics. The transparency of the network using is increased.
Year | maximum load | Date | |
---|---|---|---|
2016 | 27.364 MW | 19.01.2016 | 17:45-18:00 |
2015 | 27.627 MW | 23.11.2015 | 16:15-16:30 |
2014 | 28.582 MW | 29.10.2014 | 17:45-18:00 |
2013 | 29.158 MW | 17.01.2013 | 18:30-18:45 |
2012 | 30.724 MW | 08.02.2012 | 18:45-19:00 |
2011 | 30.090 MW | 22.02.2011 | 17:45-18:00 |
2010 | 30.028 MW | 31.03.2010 | 11:45-12:00 |
2009 | 28.432 MW | 03.12.2009 | 14:00-14:15 |
2008 | 29.697 MW | 19.11.2008 | 11:30-11:45 |
2007 | 29.968 MW | 04.12.2007 | 16:45-17:00 |
2006 | 32.382 MW | 30.01.2006 | 00:00-00:15 |
2005 | 30.300 MW | 12.11.2005 | 05:45-06:00 |
2004 | 29.333 MW | 13.12.2004 | 16:45-17:00 |