Tendering Procedure of grid losses 2008

The Energy Industry Act (Energiewirtschaftsgesetz) and Electricity Grid Access Ordinance (Netzzugangsverordnung Strom) oblige the grid system operators to procure energy required for the compensation of grid losses (loss energy) in a transparent, market-oriented and non discriminating manner.

Amprion has chosen the method of public tender for the purpose of covering it’s grid losses energy requirement for the year 2008. The procurement takes place in several separate tenders.

The tender dates are as follows:

1.  tender: 22.2.2007

2.  tender: 8.3.2007

3.  tender: 17.4.2007

4.  tender: 23.5.2007

5.  tender: 12.6.2007

6.  tender: 19.7.2007

The coverage of Amprion’s total requirement will be divided into 5 equal parts per tender day. The profile of one part tender can be found in Excel-format (“Profile-Grid-Losses-2008 on our website.

The general terms and conditions for tender participation including information concerning products, offer submission and award procedure can be found on our website. A prerequisite for participating in the call for tender process is the existence of a valid balance group of the participant in the Amprion control area.

Furthermore please find the offer file (“Tender-Grid-Losses”) as well as a draft of the electricity supply contract (Stromliefervertrag) to be used.

In case of interest in participation please contact the following e-mail address with reference to “Interest tender grid losses”: E-Mail to Amprion

Open tenders:

1.  tender: 22.2.2007
     Period of submission: 21.2.2007, 11 a.m. – 22.2.2007, 11 a.m.

2.  tender: 8.3.2007
     Period of submission: 7.3.2007, 11 a.m. – 8.3.2007, 11 a.m.

3.  tender: 17.4.2007
     Period of submission: 16.4.2007, 11 a.m. – 17.4.2007, 11 a.m.

4.  tender: 23.5.2007
     Period of submission: 22.5.2007, 11 a.m. – 23.5.2007, 11 a.m.

5.  tender: 12.6.2007
     Period of submission: 11.6.2007, 11 a.m. – 12.6.2007, 11 a.m.

6.  tender: 19.7.2007
     Period of submission: 18.7.2007, 11 a.m. – 19.7.2007, 11 a.m.

 

Results of the tendering procedure:

1.  tender: 22.2.2007
     - Average price: 51,75 €/MWh
     - Maximum price (of the awarded offers):51,84 €/MWh

2.  tender: 8.3.2007
     - Average price: 54,68 €/MWh
     - Maximum price (of the awarded offers):54,78 €/MWh

3.  tender: 17.4.2007
     - Average price: 55,97 €/MWh
     - Maximum price (of the awarded offers):57,05 €/MWh

4.  tender: 23.5.2007
     - Average price: 56,69 €/MWh
     - Maximum price (of the awarded offers):56,75 €/MWh

5.  tender: 12.6.2007
     - Average price: 57,25 €/MWh
     - Maximum price (of the awarded offers):57,25 €/MWh

6.  tender: 19.7.2007
     - Average price: 57,59 €/MWh
     - Maximum price (of the awarded offers):57,64 €/MWh

NB: Amprion reserves the right to amend and update all published information as and when necessary.

The German documents – especially the electricity supply contract – are the legally binding documents. The English documents and the English website are provided for convenience of reading only.